Virar-alibaug Multimodal Corridor Route Map ((free))
Originates at Navghar in Virar (Palghar district), travels southeast through the logistics hubs of Bhiwandi and Kalyan, cuts through Taloja and Panvel, and terminates at Balavali near Pen on National Highway 17.
🏭 It creates a seamless logistics chain: JNPT Port ↔ Alibaug ↔ VAMC ↔ Nashik/Mumbai . This reduces logistics costs drastically for industries in the MIDC zones.
The corridor will culminate in Alibaug, a key tourist and industrial hub across the Raigad district, facilitating easier access to beaches, industrial areas, and residential zones.
The alignment is strategically designed to integrate with India’s broader highway network, providing seamless interchanges with NH-8 (Ahmedabad) NH-3 (Agra) NH-4 (Pune) Mumbai-Pune Expressway Multimodal Infrastructure virar-alibaug multimodal corridor route map
Facilitating heavy freight movement away from city roads. 🏗️ Project Phases & Current Status (2026)
The is one of the most ambitious infrastructure projects in Maharashtra, aimed at transforming the transport landscape around the Mumbai Metropolitan Region (MMR) . Designed as an expressway-cum-metro link, it will connect the northern outskirts of Mumbai (Virar) to the coastal town of Alibaug in the south, significantly reducing travel time between satellite cities and boosting economic development.
The Virar-Alibaug Multimodal Corridor is designed to be a model of modern transportation infrastructure, incorporating several innovative features: Originates at Navghar in Virar (Palghar district), travels
Virar-Alibaug Multimodal Corridor (VAMC) is a 126 km-long planned project in the Mumbai Metropolitan Region (MMR) that aims to reduce travel time between Virar and Alibaug from four hours to approximately two. Route & Major Connectivity The corridor starts at ) on the Mumbai-Ahmedabad Highway (NH-48) and terminates at ) in Raigad
, it aims to reduce travel time between Virar and Alibaug from four hours to roughly marathon.in Route & Key Connectivity The corridor starts at
Virar Alibaug Multimodal Corridor: Route & Status (2026) The corridor will culminate in Alibaug, a key
After initial bids on an Engineering, Procurement, and Construction (EPC) model came in significantly over budget, the state government decided to restructure the project to make it financially viable.
The corridor includes dedicated lanes for Metro Line 14 , Bus Rapid Transit (BRT), and essential utilities like gas and water pipelines in a single 99-meter Right of Way. 🚀 Why It’s a "Game-Changer"