Worknc Tutorial -
The central viewport where your 3D geometry, stock material, and toolpaths are visualized.
For vertical or steep walls, Z-Level (waterline) machining is best.
: Define the Machining Axis System. Align your X, Y, and Z axes to match how the actual physical part will be oriented on your CNC machine. 📦 Step 2: Define Stock and Part Geometry
Choose to automatically envelope the CAD geometry. Add positive offsets to the bounding box dimensions ( ) to represent the true dimensions of your raw block. Click Validate to generate the initial stock visualization. 3. Phase 2: Selection of Cutters and Tool Holders worknc tutorial
Upon launching WorkNC, you are greeted with the Project Manager.
Roughing is where WorkNC shines. The goal is to remove the bulk of the material as quickly and safely as possible.
Check for remaining material to ensure all surfaces are machined. 5. Post-Processing: Generating NC Code Once the simulation is verified: The central viewport where your 3D geometry, stock
He clicked Yes.
What Is G-Code? Introduction To CNC Programming - Lincoln Tech
Walk through a (e.g., machining an injection mold cavity). Align your X, Y, and Z axes to
Input your exact tool flute length, extension length, and complete 3D tool holder assembly parameters. Run the analysis. WorkNC will color-code the toolpath.
After roughing, there is "rest material" in corners that the large tool couldn't reach.
精加工的目的是。
It was 4:30 PM. The shop boss was already leaning against the doorframe. Elias didn't hit "Post-Process" yet. He opened the WorkNC Toolpath Viewer