Kerala Pwd Price 3 Jun 2026
Strict declaration rules regarding raw materials, such as whether a Departmental Supply of Bitumen is active. 2. Online Estimate Engineering & Observed Data PRICE ANALYTICS
The Public Works Department (PWD) in Kerala has revolutionised the management of public infrastructure projects through the implementation of (Project Information and Cost Estimation). As an integrated e-platform developed by the National Informatics Centre (NIC) Kerala, PRICE 3.0 streamlines the entire lifecycle of a project—from conceptualisation to completion, ensuring transparency, efficiency, and accuracy in estimation.
Aligning prices with market reality ensures contractors don't cut corners. kerala pwd price 3
Manual or mechanical loading and unloading costs are included based on the SoR norms.
: The portal provides digitally signed license registration cards with QR codes for verified contractors. Local Market Rates (LMR) : The system includes a feature for Local Market Rate Justification Strict declaration rules regarding raw materials, such as
The Schedule of Rates (SoR) is the official rate book of the Kerala PWD. It is the foundation of all cost estimates for government civil works, including buildings, roads, and bridges. The SoR provides standard unit rates for thousands of construction items and is updated periodically to reflect market conditions.
| Component | % of Price 3 | Source | | :--- | :--- | :--- | | | 55% | Quoted from district-level dealers (Price 1) | | Labour & Shuttering | 25% | PWD standard labour schedules | | Plant & Machinery (Mixer, Vibrator) | 10% | Depreciation + fuel (linked to diesel price index) | | Overheads (Site office, security, water) | 5% | Fixed | | Contractor’s Profit | 5% | This is the key number. In Price 3, profit is legally capped at 5%. | As an integrated e-platform developed by the National
For contractors, understanding the latest "price 3" data is essential for accurate bidding.
is not a fixed number but a rate category representing district-level standard market rates for medium-quality civil works materials. It ensures fairness, transparency, and cost control in state-funded construction projects. For accurate usage, always refer to the latest District Schedule of Rates published by the Chief Engineer (PWD), Kerala.
| Parameter | Typical Trend in Price Series | Impact on Estimation | | :--- | :--- | :--- | | | Increasing | Higher costs for concrete structures and road base courses. | | Bitumen | Volatile | Affects Road Re-surfacing and National Highway works. | | Steel (TMT Bars) | Stabilizing | Positive impact on structural building estimates. | | Labor | 5-8% Annual Increase | Directly increases overall project cost percentages. |
1 THIRUVANANTHAPURAM 147 44.12% 2 VITHURA, TVM 151 48.04% 3 KOLLAM 151 48.04% 4 PATHANAMTHITTA 147 44.12% 5 CHENNERKARA 147 44.12% PWD Schedule of Rates 2024-25 | PDF - Scribd